Projects
Culvert headwall designs for Onlsow Road Waste Facility
![](https://www.design-analysis.com.au/wp-content/uploads/2022/05/120-Culvert-26-Pic-4-scaled.jpg)
Project Date: February 2019
Client: KBR
Project Type: Civil & Infrastructure
Location:
Categories: Culvert design
Project Description:
Design & Analysis developed the detailed design of the headwalls and “book shelve” wing walls for retrofitting to existing six culverts.
Designs required compliance with the latest requirements of AS5100 – 2017 including early thermal cracking requirements and new rock protection in the form of rip rap to tie the headwalls in with the existing batters.
Project Scope:
- Detailed headwalls and wing wall design